Willow Crystal Lake
Crystal Lake, IL

GHJCC is proud to have been selected to remodel Willow Creek Community Church’s new permanent location in Crystal Lake. The property at 100 South Main offers a 193,000 square foot building situated on a 26-acre campus along a visible, high-traffic corridor in downtown Crystal Lake. This site’s central location and size will beautifully serve the community’s needs and broaden the reach of their congregation. Building design by BLDD Architects.

PHASE 1 – Remodel includes a new 26,000 sq. ft. Auditorium built with precast concrete and steel construction. The Auditorium includes a catwalk, a new sloping floor with fixed theater seating, and acoustic wall panels. It also includes remodeling 40,000 sq. ft. to create a large gathering space, Kitchen, Café, Restrooms, Offices and Christian Education spaces. Majority of the spaces will receive new floor, paint and ceiling improvements.